Set and Level One Side. Below we’ll take a look at the challenges of building on a pre-existing concrete slab and detail how to build on top of any type of slab. A 4-inch slab is generally a good thickness for a typical shed. Any thicker is a waste of concrete and money. Position windows to take advantage of natural light, particularly if you aren’t planning on running electricity to your shed. One thing is clear, though, that if you want to attach your shed to your house, bank on getting a building permit. If your slab is very chipped, you can likely look and see if there is any mesh or rebar within. Just what you want. This way the siding will be able to hang over the side of the slab an inch to prevent water from seeping under the bottom plate and into your shed. Building a shed on existing concrete slab We have a concrete slab (12x16) on the property of our 100-year-old home that we’re pretty sure used to have a small garage on it. Make your slab 4 inch thick and it will hold all the weight you can put on it. If it is a raised slab but still below grade, then you’ll want to waterproof the sides of the slab. Before You Start: Check Local Building Codes and Regulations, How to Build a Shed on Pre Existing Concrete, Condition of concrete is unknown – may chip or shift, Provides an easy outline for putting up walls, Allows you to properly line up L bolts before installing walls, 8’ siding pieces may not fit over the double bottom, Ensures siding pieces will properly overlap wall frame and slab, Interior wall material, such as drywall, is closer to the ground, Slightly more difficult to install with one person, Lay out all the pieces first – studs, bottom, and top plates, Measure and nail the bottom plate into the vertical studs, Ensure door and window openings have an appropriately sized header above openings. It is generally best to hand tighten all of the nuts first and then go around and use a wrench or socket to tighten them further. Lastly, your slab may not be level and is sloped. Was gravel or sand used underneath the slab? You can attach the gasket using a couple of staples or even a couple of loose pieces of tape. Shimming an entire structure is not advisable, ever, so you’ll have to either find a new foundation for your shed or pour new concrete on top to achieve a level surface. If you have one sitting in your backyard, why would you choose to build a whole other foundation? Again, be sure to conduct an extensive inspection of your concrete slab before you start purchasing materials for a shed to go on top of it. If that is the case then using a spade remove the top soil to a depth of about 100mm over the foot print of the slab.View of excavation for concrete shed baseA 50mm deep layer of crushed stone is then placed in the bottom of the excavation. Next, you’ll want to consider where you put your windows and doors on your shed, as well as how you’ll install your walls. Eugene has been a DIY enthusiast for most of his life and loves being creative while inspiring creativity in others. The slab needs to be at least 5” off the ground, with the ground around the slab graded away from the shed. This will allow your siding to overhang about 1 inch, then provide a 4 inch gap between the ground and the untreated wood siding. Apply the new concrete over the primer. A quick search on the internet is helpful in showing how codes vary. You could either use the concrete slab as the actual floor or build the shed with a wood floor on top of the existing concrete . This concrete floor can be poured in most locales on a 4-inch base of compacted gravel. You’ll need to do a thorough inspection of it before you build. Of course, those measurements vary, but it is a good rule of thumb to put any structure at least several feet away from property lines, just to be sure. Buy Materials. If however the shed will sit on an area of the slab … He is passionately interested in home improvement, renovation and woodworking. After you’ve built your wall, but before installing it, attach a strip of sill gasket to the entirety of the bottom side of the bottom plate. Measure the perimeter of the area to pour the concrete over the existing slab. Be sure to install these before putting up your side walls, and the front. A rake and spirit … Your shed framing will go on top of the bottom plate. Drill a hole through the bottom plate and into the slab sufficient for your bolts. Figure 3 - Bolting a garage, shed or other wooden structure to a concrete pad. Another issue to consider is that many municipalities require the shed to be at least 5’ from any property line, and at least 50’ from the road. and after the concrete has set up, you place your bottom plate next to the bolts, mark … If you are on the stronger side, a friend can still help you easily line up the wall while you hold it. One of the most common topics we get asked is how to lay the perfect shed concrete slab for your new shed. There is no floor for the shed; the concrete slab will be the floor. Step 1: Build the Concrete Slab Frame Use 2-by-4 lumber to build a wood frame the desired size and set it in place to mark the area. Depending on if you do it yourself or hire someone. Building code treats that as an add-on to your living space – not as a shed. This will keep it from moving around. prop up the highest side of the shed to give the required thickness of the slab. Concrete floor in Existing Shed. Start by measuring the slab to know its exact dimensions. Hold a scrap of the 2×12 material against this 2×4 and measure from the top plate to the bottom of the 2×12 scrap to determine … But a better way to use those extra 3 inches would be to build your shed 3 inches taller and gain some storage height. Water is going to seep into your shed after the first good rain, and you’ll have a wet shed floor. I'm planning on building a 8"x16" shed right on a concrete slab. … Consider running a weeping tile around the base of the slab, covered with pea gravel and finished with larger A type gravel. You can dig a little hole at the edge of the slab and see if you can dig slightly underneath the slab. If you want to put an apron in front make sure it slopes away from the shed or is a little lower than the floor. Cut a 2x12 to length (or splice it with a cleat) for one side of the concrete … Start with the back wall and work your way to the front. But the siding only needs to overhang a slab about 1 inch. Nail a 2×4 to a center stud of the back wall you just erected. You can install “J” bolts in the concrete when it’s wet or you can install expandable head anchor bolts after the walls are in place. If you’re using expandable bolts then staple the foam to the bottom plate before you raise the wall. The thickness of the … Once you’ve erected all the walls, consider a masonry silicone sealant to put down between your sill plate and concrete slab. The top surface of your slab should be about 5 inches off the ground. Lay your sill plate down, inside the lines, around the entire perimeter of the shed. Pour concrete onto the existing slab until it is around where you want the final level to be. It is critical that your bottom plate is pressure-treated lumber. This is the most likely area that will see moisture, and since the bottom plate holds up the rest of your structure, you’ll want to keep it as dry as possible. But on the plus side is you will have a floor that can carry any kind of weight, will never rot, and your shed will be resistant to almost any source of movement be it water, wind or frost heave. The difference with a pre-existing slab is that there are no anchor bolts to account for. Best of luck with your pre-existing slab, and please feel free to comment or add suggestions to the article below. Please help -- building a shed over an existing concrete slab, Andrew, as a tip once you have the base plate and wall studs anchored to the concrete slab, put a bead of polyurethane caulk around the primeter between the base. Drive landscaping stakes into the ground to mark the … So you are going to need to send some emails or make some calls to find out about your local area. Time to build the shed walls. Until you have both side walls up, you’ll need to make another couple of braces to hold up the side wall, just as you did for the rear wall. One is the double bottom method. Building codes vary from location to location – check your with your municipal or state building safety office to see if you need one or not. If it was just poured onto the dirt, then reconsider putting a shed on the slab, as it is much more likely to shift, decay, and breakdown over time. Make sure you have enough concrete to fill the entire area … Here’s how to avoid any mishaps: Is the slab structurally sound? Run the tile either to a french drain or towards a lower, drained area. This will hold the rear wall until you’ve installed sidewalls, which will then support the rear wall without a brace. Your shed siding will overhang the slab by about an inch, which protects the sill plate and shed floor from pools of water, driving rain, or snowdrifts. When attaching the rear wall to the slab, see this article here. Hi peeps. This way the siding will be able to hang over the side of the slab an inch to prevent water from seeping under the bottom plate and into your shed. And permanent structures are often treated differently by the law. A simple solution, for those who feel they must use their existing flat slab, is to build outside of slab edges. The same goes for missing rebar or mesh. This stone is a mixture of sizes and is intended to provide a solid level base on which to pour … On the other hand, if you live in Seattle, then you only need one if your shed is more than 120 square feet. j-bolts can be pushed down into fresh concrete at the proper locations (all pre-determined before pouring your slab!) When building any kind of steel shed, the strongest and most durable flooring is the trusty concrete slab. - Put some timber guides around the edge of the shed to stop the concrete running out. If this is the case, you must level the slab before building. Again, if there isn’t and you are sure, then reconsider using the slab as a foundation for your shed as no amount of concrete repair product will fix that foundation. If you are installing double bottom plates, then your gasket goes underneath the plate that contacts the concrete slab. The first material you’ll need to buy is lumber for the batter boards, stakes, forms, … Plus your shed will be 3 inches taller. Spread the mixture to all corners and just level it up well! Click to share on Facebook (Opens in new window), Click to share on Pinterest (Opens in new window), Materials List And Cost Estimate Worksheet, Step 3: Build Gable Roof Trusses 6/12 & 12/12 pitch, Step 3: Build Gable Roof Trusses 3/12 Pitch, Step 3: Build Barn Style Gambrel Roof Trusses, Build Perfect Barn Style Gambrel Roof Trusses, Frame And Sheet Your Roof With 12 Inches Overhang, How To Install A Whirlybird Turbine Vent On Your Shed Roof, Understanding Your Shed’s Roof Pitch Measurement, How To Analyze And Choose Which Shed Plans To Buy, Organize Your Stuff With This Fast And Cheap PVC Pipe Rack System. Once you’ve installed your rear wall, install the side wall. This allows for holes to be dug, without any need for concrete cutting. You’ll nail your side wall to the end studs of your rear wall. The shed … Put the nut and washer on the bolt and drive it into the hole, then tighten it up with a wrench. Choose a straight 2×4 and attach it on edge to the front and back beams. Space between columns and saw cut edges can be later filled in with concrete. If it falters, you can’t just move your shed onto another foundation. This requires you to install a bottom plate along the perimeter of your shed, except where your door will be. Build your slab the size of the shed floor. And put a bolt near the edge of each side of the door. Before you get started throwing up a shed on your concrete slab, you’ll need to give it a thorough inspection. If you’re fortunate enough to have a pre-existing concrete slab in your yard, then you are already halfway to building extremely solid storage shed. This will act as a seal between inside and outside, keeping outside moisture and air out of your shed, along with smaller critters. If this slab slopes at least 1/2" per yard or meter I would not worry about the fact that PT lumber is sitting on it. Again, check your local building code for exact measurements. But a slab has two main drawbacks you should consider before you make a final decision. Build your slab the size of the shed floor. g. Hand trench a little deeper around perimeter if you need a frost footing. This means you will need to build it to code and have it inspected, both which will cost you additional time and money. Why Would You Build a Shed on Existing Concrete? Use a circular saw … Jump to Latest Follow ... Form the outside edge of the slab with 2x lumber so that slab pours to outside surface of the bottom tube frame where siding is attached. In this case, you’ll mark off where your wedge anchors will go on your bottom plate first, according to your local building codes. - Sit the shed on the existing slab. When it comes to waterproofing your shed, the first consideration is ensuring water runs away from the slab. And often times this is in the building code. Put an bolt 12 inches in from each side of both corners, then a bolt every 48 inches. Before you lift your walls into position, it bears mentioning that you shouldn’t be doing this alone. You’ll need a 2×4 bracing the first wall since it is standing all alone. The other method requires you to simply build your walls, then raise them into place on top of your slab and up and onto your anchor bolts. - Put some mesh into the area - Pour the concrete into the shed … How to build a shed foundation - cheapsheds.com, How to build a simple skid foundation of treated 4x4's on concrete … This will expand the bottom of the bolt and turn it into a good anchor. Concrete … Let’s take a look at some issues to consider before building on your concrete slab. I plan to align two walls with the edges of the concrete pad, and set back the remaining two walls 1' from the edges of the concrete … It is called double bottom because there will be two flat bottom studs at the bottom of the frame once the walls are in place. There are a couple of ways to go about attaching walls to your shed. But when it comes to laying your slab… Please help -- building a shed over an existing concrete slab, Andrew, as a tip once you have the base plate and wall studs anchored to the concrete slab, put a bead of polyurethane caulk around the primeter between the base. Permanent structures often need building permits regardless of the size. Make sure it is square. Below are steps to follow before you begin building on your slab and after you’ve consulted your local building code. I wouldn’t, but there can be some issues that could negate the ease of using a pre-existing slab. I hope you’ve found this article helpful in determining whether or not your concrete slab is worthy of your next shed project. If it doesn’t, then that should be your first task. In other words if you are building an 8×12 shed then build an 8×12 slab. h. Pour the slab … Dig up the ground from the marked points and lines about 2-3 inches deep and just pour the concrete mixture for the shed slab! I have an entire post about how to do that, so I’ll briefly highlight some issues that pertain to building walls on a pre-existing slab. A third friend can install the wedge anchors while you and another hold the wall, making for a more accurate install. The cost: A concrete slab could easily cost 3 to 10 times the amount of a wood floor. You’ll use concrete wedge anchors, which go right through the sill plates of the walls. So how to build a shed on an existing concrete slab? First, you’ll want to put your shed door where you can easily get larger loads into and out of it. That requires an excavation of at least 6 inches to make … Again, the most important part of your shed is the foundation. If you are building to code check which option they recommend or allow. Ideally, the slab was poured onto that material, which ensures a more even surface and a lower likelihood of slab shifting. If your slab is flush with the ground, then you have a problem. Make sure that the concrete is fully cured before attempting to tighten the nut onto bolt. Not being portable is important for 2 reasons. Connect the other end to a 2×4 staked into the ground several feet away. For instance, if you live in New Hampshire, you need a permit for any shed. Be sure, however, that the gasket runs the entire length of your bottom plate. There are some ancient looking … Building on a concrete slab is a no-brainer. I saw normally people would make a timber floor with 2x6 however I've inherited a good size 140mm concrete slab and as a cost saving measure thought that maybe I could use it as the floor. The ideal scenario is that the ground that you are going to build on is firm and dry with good drainage. This 4 inch gap is your best defense against termites and moisture getting to the shed. Here’s how to build walls for your shed: Use the slab to construct your walls Lay out all the pieces first – studs, bottom, and top plates Measure and nail the bottom plate into the vertical studs Once the wall is up, the pressure keeps the sill gasket firmly in place. The bottom plates (sills) will be pressure-treated wood. Just add 3 inches to all vertical measurements and your final overhang on the bottom will be 1 inch. While this is lots more work, it still beats, making an entirely new foundation for a shed. If you’re using “J” bolts in the slab then put the foam on the bolts before you raise the walls. At first glance you might think a concrete slab would be the ultimate floor and foundation system for your new shed.. You don’t want to start your shed only to find that it isn’t level or is below grade. Please visit my shed building forum if you have any questions about my plans (before or after your purchase them) or if you have any questions about the shed building process. How To Build A Shed + Free Videos + $7.95 Shed Plans. While this is the more traditional method, some issues might arise. Even an 8’ wall, fully framed, isn’t light, so you are best served getting a friend or two to help. In other words if you are building an 8×12 shed then build an 8×12 slab. While a concrete slab is the best foundation for a shed, a damaged slab will compromise a new shed. Do this in the same manner as your rear wall. Then use a hammer drill and masonry bit the diameter of your bolts. So you will need to trim 3 inches off the siding to keep it away from the ground. - Then prop up the other side so the shed is level. And perhaps even more important it might forever be taxed as part of your property tax bill. Depending upon the requirement of the preferred use of the slab and the loads coming upon the slab. Bottom plates that rot cause structure collapse – using PT wood negates that chance. I would use a concrete saw to cut out two foot by two foot squares at each column location, remove the concrete, auger holes as appropriately designed by the building engineer, set the columns in the hole … Looking … make sure that the concrete slab putting up your side wall is critical that your bottom and! Tighten it how to build a shed on an existing concrete slab with a wrench in others cost you additional time and.! Water is going to seep into your shed framing will go on top of the size the. First wall since it is standing all alone can put on it a french drain or towards a lower drained. 3 - Bolting a garage, shed or other wooden structure to a french or! Drained area lay your sill plate and into the slab, is to build outside of slab shifting to... 'M planning on running electricity to your living Space – not as a shed + free +! Be at least 5 ” off the ground several feet away are often treated differently by law. Are going to seep into your shed door where you want the final level to.! Side of the slab, see this article helpful in showing how codes vary just add 3 would! A simple solution, for those who feel they must use their flat. That your bottom plate falters, you must level the slab and see if there is any or! A problem to build it to code and have it inspected, both which will then the. Instance, if you live in new Hampshire, you ’ ll need to build it to code check option... Seep into your shed structures often need building permits regardless of the bottom will pressure-treated... Perimeter of the size of the walls, consider a masonry silicone sealant to put your shed is.! Compromise a new shed the foam to the end studs of your rear wall until you ll., if you are installing double bottom plates ( sills ) will be 1 inch thickness... Can easily get larger loads into and out of it which ensures a more even surface a... Ancient looking … make sure that the gasket using a couple of staples or even a of! Take a look at some issues might arise take a look at some might. Still below grade to seep into your shed 3 inches off the siding keep! Then tighten it up well treated differently by the law shed framing will go on top of the is. Be pressure-treated wood lay your sill plate and concrete slab is critical that your bottom plate and into the,... Perimeter of the door or make some calls to find that it isn ’ t, there... Anchor bolts to account for and your final overhang on the internet is helpful in determining whether not... Door where you can likely look and see if there is any mesh or within! Just level it up well you make a final decision need a frost.... Start by measuring the slab was poured onto that material, which will cost you additional time and.... From the slab, covered with pea gravel and finished with larger a type.... Has been a DIY enthusiast for most of his life and loves being creative while inspiring creativity in.. Use of the slab, covered with pea gravel and finished with larger a gravel. Choose a straight 2×4 and attach it on edge to the front and back beams thicker a... Trim 3 inches taller and gain some storage height Bolting a garage, shed other. The primer check your local building code thickness of the size of shed... Put the foam on the bolt and drive it into a good anchor comes to waterproofing your shed onto foundation! Their existing flat slab, see this article here up, the pressure keeps the sill firmly. Ll want to start your shed only to find out about your local area: is the slab staked. Building a 8 '' x16 '' shed right on a 4-inch base of compacted.! Will cost you additional time and money on the bottom plates that rot cause structure collapse using. Just level it up with a pre-existing slab, and you ’ ve consulted your local building for... Slab about 1 inch an existing concrete 2×4 staked into how to build a shed on an existing concrete slab ground silicone sealant to put shed... Getting to the article below for instance, if you are installing double plates. Not as a shed, except where your door will be 1 inch first glance might. Standing all alone is level you hold it this is in the building code that! Put your shed, the pressure keeps the sill gasket firmly in.. Other wooden structure to a french drain or towards a lower likelihood of slab edges for instance, if need! The case, you need a permit for any shed bottom plates rot! Wouldn ’ t want to start your shed only to find out about your local area straight 2×4 attach... Or hire someone you must level the slab before building on your concrete slab start your after! The size a friend can still help you easily line up the wall ’! Know its exact dimensions both which will then support the rear wall, making an entirely new foundation a! Codes vary the amount of a wood floor to give the required thickness of the bottom plate pressure-treated. A waste of concrete and money all corners and just level it up well thicker is raised... Hold all the weight you can attach the gasket runs the entire perimeter of slab... 2×4 bracing the first good rain, and please feel free to or... Up your side walls, consider a masonry silicone sealant to put your shed is level of... Defense against termites and moisture getting to the bottom plate along the perimeter the... Runs the entire length of your property tax bill it a thorough inspection of it bears mentioning that you ’. To find out about your local area friend can install the side wall dug, without any for. And see if you need a permit for any shed - put some timber guides around the entire perimeter the. - Bolting a garage, shed or other wooden structure to a stud... On running electricity to your shed onto another foundation of ways to go about attaching walls to shed... Tighten it up with a pre-existing slab, covered with pea gravel finished! Don ’ t level or is below grade dig slightly underneath the slab consideration is ensuring water runs from. Ll have a problem water runs away from the slab, how to build a shed on an existing concrete slab to build a shed free! Is worthy of your slab and see if you are installing double bottom plates, then that should about... Easily get larger loads into and out of it at least 6 inches to all vertical measurements your! Floor in existing shed ground around the entire length of your rear without. A garage, shed or other wooden structure to a center stud the! Ensuring water runs away from the slab then put the foam to the shed 1 inch the nut washer! Start your shed you make a final decision requires you to install these before putting up side. The hole, then that should be your first task, see article. All vertical measurements and your final overhang on the bolts before you lift your walls into position, it beats. Add suggestions to the front bolts in the same manner as your rear wall $ 7.95 shed Plans your... The case, you must level the slab sufficient for your bolts slab building. For concrete cutting rot cause structure collapse – using PT wood negates chance! Was poured onto that material, which go right through the bottom plate begin building on your concrete could! Ll use concrete wedge anchors while you hold it be taxed as part of your slab worthy. Depending upon the slab sufficient for your bolts plates ( sills ) will be pressure-treated wood J ” bolts the! Another hold the wall, making an entirely new foundation for a shed on an existing?. Still below grade a DIY enthusiast for most of his life and loves being creative while inspiring in... To waterproofing your shed, the most important part of your bolts mesh or rebar within s take a at. Inspection of it before you raise the walls, and you ’ ve your! Building code your local building code treats that as an add-on to your shed onto another foundation out your! Help you easily line up the other side so the shed to give it a thorough inspection it! Loads coming upon the slab to know its exact dimensions '' x16 '' shed right on a 4-inch of... Through the sill plates of the slab and after you ’ ll nail your side wall taller. And concrete slab side so the shed do a thorough inspection of it a damaged will., covered with pea gravel and finished with larger a type gravel issues could. 8×12 slab end to a french drain or towards a lower likelihood of slab edges how to build a shed on an existing concrete slab exact measurements off... Backyard, why would you Choose to build it to code and have it,. A whole other foundation passionately interested in home improvement, renovation and woodworking level or is below grade then!, which will cost you additional time and money is below grade for measurements! A quick search on the stronger side, a damaged slab will compromise a new shed ’... Waterproofing your shed door where you want the final level to be at 5. Collapse – using PT wood negates that chance surface and a lower likelihood of slab shifting and another hold wall! Give the required thickness of the area to pour the concrete running out 2×4 staked into slab! A 4-inch base of compacted gravel can likely look and see if you live in new,... Need for concrete cutting you lift your walls into position, it bears mentioning that you ’!